Year 9 elective Engineering students were challenged to design and build a bridge that would span an 80 cm gap using coffee stirrers.
The winning design weighed 270 grams and supported a load of 18 kg.
Congratulations to all students involved
Testing bridges
Image: Jack testing his design
Testing Bridges
Image: Setting up with a smaller weight
Testing strength
Image: Gradually increasing the weight to test the bridges strength.
Copyright for this website is owned by the State of New South Wales through the Department of Education. For more information go to http://www.dec.nsw.gov.au/footer/copyright.